EAL Level 3 NVQ Diploma in Installation and Commissioning
501/0733/1
- Level: Level 3
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: Excellence, Achievement & Learning Limited (Recognised)
- Total credits: 149
- Guided learning hours: 302
- Total qualification time: 1490
- Assessment methods: Portfolio of Evidence
Units (45)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Complying with statutory regulations and organisational safety requirements RN5260/A/601/5013 |
Level 2 | 5 | 35 |
Using and interpreting engineering data and documentation RN5260/Y/601/5102 |
Level 2 | 5 | 25 |
Carrying Out Fault Diagnosis on Escalator Installations RN5260/H/601/0677 |
Level 3 | 50 | 60 |
Carrying Out Fault Diagnosis on Lift Installations RN5260/R/601/0660 |
Level 3 | 50 | 60 |
Checking and Setting Lift Installations RN5260/L/601/0673 |
Level 3 | 25 | 77 |
Commissioning Air Conditioning and Ventilation Equipment and Systems RN5260/L/601/0642 |
Level 3 | 118 | 224 |
Commissioning Compressed Air Equipment and Systems RN5260/Y/601/0644 |
Level 3 | 114 | 182 |
Commissioning Electrical/Electronic Equipment and Systems RN5260/J/601/0574 |
Level 3 | 118 | 224 |
Commissioning Emergency Electrical Power Generation Equipment and Systems RN5260/D/601/0628 |
Level 3 | 114 | 182 |
Commissioning Engineered Systems RN5260/L/601/0575 |
Level 3 | 123 | 259 |
Commissioning Environmental Pollution Control Equipment and Systems RN5260/D/601/0631 |
Level 3 | 114 | 182 |
Commissioning Escalator Installations RN5260/A/601/0684 |
Level 3 | 100 | 182 |
Commissioning Fluid Power Equipment and Systems RN5260/Y/601/0627 |
Level 3 | 115 | 196 |
Commissioning Fresh Water Distribution Equipment and Systems RN5260/F/601/0654 |
Level 3 | 114 | 182 |
Commissioning Heating and Ventilation Equipment and Systems RN5260/J/601/0638 |
Level 3 | 118 | 224 |
Commissioning Instrumentation and Control Equipment and Systems RN5260/R/601/0626 |
Level 3 | 115 | 196 |
Commissioning Mechanical Equipment and Systems RN5260/F/601/0573 |
Level 3 | 118 | 224 |
Commissioning Process Controller Equipment and Systems RN5260/R/601/0576 |
Level 3 | 118 | 224 |
Commissioning Refrigeration Equipment and Systems RN5260/Y/601/0658 |
Level 3 | 114 | 182 |
Commissioning Waste/Foul Water Distribution Equipment and Systems RN5260/K/601/0650 |
Level 3 | 114 | 182 |
Commissioning Workplace Environmental Control Equipment and Systems RN5260/H/601/0632 |
Level 3 | 118 | 224 |
Handing Over and Confirming Completion of Installation or Commissioning Activities RN5260/D/601/0547 |
Level 3 | 20 | 35 |
Installing Air Conditioning and Ventilation Equipment RN5260/D/601/0564 |
Level 3 | 118 | 224 |
Installing Compressed Air Equipment RN5260/H/601/0565 |
Level 3 | 114 | 182 |
Installing Electrical/Electronic Equipment RN5260/D/601/0550 |
Level 3 | 118 | 224 |
Installing Emergency Electrical Power Generation Equipment RN5260/R/601/0559 |
Level 3 | 114 | 182 |
Installing Environmental Pollution Control Equipment RN5260/J/601/0560 |
Level 3 | 114 | 182 |
Installing Equipment to Produce an Engineered System RN5260/M/601/0553 |
Level 3 | 123 | 259 |
Installing Escalator Equipment RN5260/H/601/0680 |
Level 3 | 33 | 161 |
Installing Fluid Power Equipment RN5260/J/601/0557 |
Level 3 | 115 | 196 |
Installing Fresh Water Distribution Equipment RN5260/M/601/0567 |
Level 3 | 114 | 182 |
Installing Heating and Ventilation Equipment RN5260/R/601/0562 |
Level 3 | 118 | 224 |
Installing Hydraulic Lift Equipment RN5260/R/601/0674 |
Level 3 | 25 | 84 |
Installing Instrumentation and Control Equipment RN5260/A/601/0555 |
Level 3 | 115 | 196 |
Installing Lift Doors, Frames and Ancillary Components RN5260/J/601/0672 |
Level 3 | 25 | 84 |
Installing Lift Ropes and Chains RN5260/J/601/0669 |
Level 3 | 25 | 84 |
Installing Lift Well and Ancillary Equipment RN5260/A/601/0667 |
Level 3 | 25 | 84 |
Installing Mechanical Equipment RN5260/K/601/0549 |
Level 3 | 118 | 224 |
Installing Process Controller Equipment RN5260/L/601/0558 |
Level 3 | 118 | 224 |
Installing Refrigeration Equipment RN5260/A/601/0572 |
Level 3 | 114 | 182 |
Installing Traction Lift Equipment RN5260/F/601/0668 |
Level 3 | 25 | 84 |
Installing Waste/Foul Water Distribution Equipment RN5260/K/601/0566 |
Level 3 | 114 | 182 |
Installing Workplace Environmental Control Equipment RN5260/L/601/0561 |
Level 3 | 118 | 224 |
Measuring and Setting Out Lift Installations RN5260/M/601/0665 |
Level 3 | 23 | 63 |
Working efficiently and effectively in engineering RN5260/K/601/5055 |
Level 3 | 5 | 25 |
