EAL Level 3 Diploma in Rail Engineering Technician Competence
603/0374/8
- Level: Level 3
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: Excellence, Achievement & Learning Limited (Recognised)
- Total credits:
- Guided learning hours: 550
- Total qualification time: 550
- Assessment methods: Portfolio of Evidence
Units (85)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Complying with statutory regulations and organisational safety requirements RN5260/K/615/1802 |
Level 2 | 100 | |
Determine requirements for the safe access to work locations for signal engineering RN5260/J/615/1855 |
Level 2 | 30 | |
Determine requirements for the safe access to work locations for telecoms engineering RN5260/L/615/1923 |
Level 2 | 30 | |
Establish information for signal engineering installation RN5260/K/615/1878 |
Level 2 | 30 | |
Establish information for signal engineering maintenance and/or fault finding RN5260/M/615/1879 |
Level 2 | 30 | |
Establish information for signal engineering testing RN5260/R/615/1857 |
Level 2 | 30 | |
Establish information for telecoms engineering installation RN5260/Y/615/1925 |
Level 2 | 30 | |
Establish information for telecoms engineering maintenance and/or fault finding RN5260/R/615/1924 |
Level 2 | 30 | |
Establish information for telecoms engineering testing RN5260/H/615/1927 |
Level 2 | 30 | |
Reinstate the work area after signal engineering activities RN5260/F/615/1885 |
Level 2 | 30 | |
Reinstate the work area after telecoms engineering activities RN5260/D/615/1943 |
Level 2 | 30 | |
Using and interpreting engineering data and documentation RN5260/H/615/1815 |
Level 2 | 50 | |
Access overhead line equipment construction sites RN5260/Y/615/1827 |
Level 3 | 20 | |
Access overhead line equipment maintenance sites RN5260/A/616/6997 |
Level 3 | 20 | |
Adjust signalling components and equipment to meet operational requirements RN5260/R/615/1907 |
Level 3 | 40 | |
Adjust telecoms components and equipment to meet operational requirements RN5260/M/615/1963 |
Level 3 | 40 | |
Allocate and monitor resources for railway electrification engineering activities RN5260/L/615/1971 |
Level 3 | 60 | |
Allocate and monitor resources for signal engineering activities RN5260/A/615/1884 |
Level 3 | 60 | |
Allocate and monitor resources for specific Permanent Way engineering activities RN5260/T/615/1821 |
Level 3 | 60 | |
Allocate and monitor resources for telecoms engineering activities RN5260/R/615/1938 |
Level 3 | 60 | |
Assess and prepare permanent way materials, components and equipment for moving on site RN5260/R/616/6083 |
Level 3 | 60 | |
Assess the performance and condition of Permanent Way assets RN5260/F/615/1823 |
Level 3 | 60 | |
Carry out fault diagnosis on traction and rolling stock communication-electronic systems RN5260/T/616/6092 |
Level 3 | 50 | |
Carry out fault diagnosis on traction and rolling stock systems RN5260/K/615/1976 |
Level 3 | 50 | |
Carry out installation of railway electrification equipment and components RN5260/J/615/1967 |
Level 3 | 70 | |
Carry out maintenance on railway conductor rail electrification equipment and components RN5260/A/616/7003 |
Level 3 | 70 | |
Carry out maintenance on railway distribution and plant electrification equipment and components RN5260/L/616/7006 |
Level 3 | 70 | |
Carry out maintenance on railway electrification equipment and components RN5260/L/615/1968 |
Level 3 | 70 | |
Carry out maintenance on railway fixed plant electrification equipment and components RN5260/J/616/7005 |
Level 3 | 70 | |
Carry out maintenance on railway power distribution electrification equipment and components RN5260/F/616/7004 |
Level 3 | 70 | |
Carry out monitoring of traction and rolling stock equipment RN5260/K/616/6090 |
Level 3 | 50 | |
Carry out non-destructive testing of rails RN5260/K/616/6087 |
Level 3 | 68 | |
Carry out preventative planned maintenance on traction and rolling stock systems RN5260/M/615/1977 |
Level 3 | 50 | |
Carry out removal of components from signalling assets RN5260/F/615/1899 |
Level 3 | 40 | |
Carry out removal of components from telecoms assets RN5260/H/615/1961 |
Level 3 | 40 | |
Carry out replacement of components from signalling assets RN5260/A/615/1898 |
Level 3 | 40 | |
Carry out replacement of components from telecoms assets RN5260/D/615/1960 |
Level 3 | 40 | |
Carry out technical assessment of railway electrification equipment and components RN5260/F/615/1966 |
Level 3 | 50 | |
Complete testing, gauging and acceptance of overhead line equipment RN5260/D/615/1845 |
Level 3 | 75 | |
Conduct functional testing of newly installed signalling systems RN5260/L/615/1890 |
Level 3 | 90 | |
Conduct maintenance testing of signalling assets RN5260/Y/615/1892 |
Level 3 | 90 | |
Conduct specified testing of telecoms systems RN5260/K/615/1959 |
Level 3 | 90 | |
Contribute to technical leadership of signal engineering activities RN5260/K/615/1881 |
Level 3 | 30 | |
Contribute to technical leadership of telecoms engineering activities RN5260/T/615/1933 |
Level 3 | 30 | |
Ensure that the rail track is fit for operational purposes following engineering activity RN5260/L/615/1825 |
Level 3 | 90 | |
Establish compliance with specifications for signalling assets RN5260/L/615/1985 |
Level 3 | 90 | |
Establish rail track geometry and position RN5260/J/615/1824 |
Level 3 | 60 | |
Gather and interpret information needed for specific permanent way engineering activities RN5260/Y/616/6084 |
Level 3 | 100 | |
Hand over and confirm completion of traction and rolling stock maintenance activities RN5260/H/615/1975 |
Level 3 | 50 | |
Implement and monitor safe working systems for permanent way maintenance or renewal RN5260/M/615/1820 |
Level 3 | 80 | |
Inspect overhead line equipment main steelwork RN5260/F/616/6998 |
Level 3 | 50 | |
Install overhead line equipment main steelwork RN5260/H/615/1832 |
Level 3 | 50 | |
Install overhead line equipment small part steelwork RN5260/T/615/1835 |
Level 3 | 60 | |
Install overhead line equipment wiring RN5260/J/615/1838 |
Level 3 | 60 | |
Install, enhance and renew overhead line earthing and bonding RN5260/Y/615/1844 |
Level 3 | 60 | |
Installation of overhead line equipment sectioning, insulation, registration and in-span components RN5260/R/615/1843 |
Level 3 | 60 | |
Isolate and earth contact systems to meet defined isolation requirements in the rail RN5260/R/615/1972 |
Level 3 | 100 | |
Maintain electrical equipment within a traction and rolling stock system RN5260/A/615/1979 |
Level 3 | 100 | |
Maintain fluid power equipment within a traction and rolling stock system RN5260/M/615/1980 |
Level 3 | 100 | |
Maintain mechanical equipment within a traction and rolling stock system RN5260/T/615/1978 |
Level 3 | 100 | |
Maintain overhead line equipment small part steelwork RN5260/J/616/6999 |
Level 3 | 60 | |
Maintain overhead line equipment wiring RN5260/K/616/7000 |
Level 3 | 60 | |
Maintain process controller equipment within a traction and rolling stock system RN5260/T/615/1981 |
Level 3 | 100 | |
Maintain traction and rolling stock air conditioning and ventilation systems RN5260/J/616/6095 |
Level 3 | 100 | |
Maintain traction and rolling stock ancillary equipment RN5260/F/616/6094 |
Level 3 | 100 | |
Maintain traction and rolling stock vehicle trim and fittings RN5260/A/615/1982 |
Level 3 | 100 | |
Maintain traction and rolling stock water supply and effluent waste systems and equipment RN5260/L/616/6096 |
Level 3 | 100 | |
Maintain, enhance and renew overhead line earthing and bonding RN5260/T/616/7002 |
Level 3 | 60 | |
Maintenance of overhead line equipment sectioning, insulation, registration and in-span RN5260/M/616/7001 |
Level 3 | 60 | |
Organise local signal engineering activities RN5260/H/615/1880 |
Level 3 | 30 | |
Organise local telecoms engineering activities RN5260/K/615/1928 |
Level 3 | 30 | |
Plan Permanent Way activities RN5260/A/615/1819 |
Level 3 | 60 | |
Plan, allocate and monitor work of a team RN5260/M/616/6088 |
Level 3 | 50 | |
Repair or modify traction and rolling stock electrical circuits RN5260/T/616/6089 |
Level 3 | 50 | |
Replace traction and rolling stock communication-electronic systems RN5260/M/616/6091 |
Level 3 | 50 | |
Restore the contact systems to operational condition in the rail engineering industry RN5260/Y/615/1973 |
Level 3 | 70 | |
Supervise the engineering work of the team RN5260/H/616/6086 |
Level 3 | 60 | |
Supervise the obtaining and preparing of materials and components needed for the renewal or maintenance of the permanent way. RN5260/L/616/6082 |
Level 3 | 30 | |
Supervise the preparation of small plant, measuring equipment and tools for permanent way renewal and maintenance RN5260/D/616/6085 |
Level 3 | 30 | |
Test traction and rolling stock communication-electronic systems RN5260/A/616/6093 |
Level 3 | 100 | |
Transfer responsibility of railway electrification equipment and components RN5260/J/615/1970 |
Level 3 | 80 | |
Transfer responsibility of signalling assets RN5260/J/615/1886 |
Level 3 | 30 | |
Transfer responsibility of telecoms assets RN5260/L/615/1954 |
Level 3 | 30 | |
Undertake detailed inspection of the Permanent Way infrastructure RN5260/A/615/1822 |
Level 3 | 72 | |
Working efficiently and effectively as a rail engineering technician RN5260/T/615/1818 |
Level 3 | 50 |
