EAL Level 2 Diploma in Rail Engineering Operative Competence
603/1295/6
- Level: Level 2
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: Excellence, Achievement & Learning Limited (Recognised)
- Total credits:
- Guided learning hours: 360
- Total qualification time: 360
- Assessment methods: Portfolio of Evidence
Units (39)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Assist in preparing resources for railway electrification engineering activities RN5260/T/615/6114 |
Level 2 | 30 | |
Assist in preventative and corrective maintenance of traction cabling systems RN5260/A/615/6115 |
Level 2 | 40 | |
Assist in the installation of traction and rolling stock equipment RN5260/J/615/6117 |
Level 2 | 60 | |
Assist in the removal of signalling equipment RN5260/T/615/6100 |
Level 2 | 30 | |
Assist in the removal of telecoms equipment RN5260/K/615/6109 |
Level 2 | 30 | |
Assist in the replacement of signalling equipment RN5260/A/615/6101 |
Level 2 | 30 | |
Assist in the replacement of telecoms equipment RN5260/D/615/6110 |
Level 2 | 30 | |
Assist with maintenance on railway electrification equipment and components RN5260/M/615/6113 |
Level 2 | 40 | |
Assist with tests and checks of signalling equipment RN5260/F/615/6097 |
Level 2 | 30 | |
Assist with tests and checks of telecoms equipment RN5260/Y/615/6106 |
Level 2 | 30 | |
Carry out scheduled maintenance on traction and rolling stock communication‐electronic equipment RN5260/J/615/6120 |
Level 2 | 60 | |
Carry out scheduled maintenance on traction and rolling stock electrical equipment RN5260/R/615/6119 |
Level 2 | 60 | |
Carry out scheduled maintenance on traction and rolling stock fluid power equipment RN5260/L/615/6121 |
Level 2 | 60 | |
Carry out scheduled maintenance on traction and rolling stock mechanical equipment RN5260/L/615/6118 |
Level 2 | 60 | |
Complying with statutory regulations and organisational safety requirements RN5260/T/615/6081 |
Level 2 | 100 | |
Determine requirements for the safe access to work locations for telecoms engineering RN5260/J/615/6103 |
Level 2 | 30 | |
Establish information for signal engineering installation RN5260/T/615/6095 |
Level 2 | 30 | |
Establish information for signal engineering maintenance and/or fault finding RN5260/A/615/6096 |
Level 2 | 30 | |
Establish information for telecoms engineering installation RN5260/R/615/6105 |
Level 2 | 30 | |
Establish information for telecoms engineering maintenance and/or fault finding RN5260/L/615/6104 |
Level 2 | 30 | |
Establish the operational condition of railway electrification and plant assets RN5260/F/615/6116 |
Level 2 | 40 | |
Installation of signalling equipment using non complex processes RN5260/J/615/6098 |
Level 2 | 30 | |
Installation of telecoms equipment using non complex processes RN5260/D/615/6107 |
Level 2 | 30 | |
Maintenance of signalling equipment using non complex processes RN5260/L/615/6099 |
Level 2 | 30 | |
Maintenance of telecoms equipment using non complex processes RN5260/H/615/6108 |
Level 2 | 30 | |
Plan railway electrification engineering activities RN5260/K/615/6112 |
Level 2 | 30 | |
Reinstate the work area after signal engineering activities RN5260/F/615/6102 |
Level 2 | 30 | |
Reinstate the work area after telecoms engineering activities RN5260/H/615/6111 |
Level 2 | 30 | |
Restore plain line track geometry to operational conditon RN5260/R/615/6086 |
Level 2 | 50 | |
Restore rail switches and crossing to operational condition RN5260/J/615/6084 |
Level 2 | 50 | |
Restore track geometry faults to operational condition by the manual repair of permanent way assets and components RN5260/L/615/6085 |
Level 2 | 30 | |
Undertake installation of overhead line equipment sectioning, insulation, registration and in‐span components under direction RN5260/H/615/6092 |
Level 2 | 40 | |
Undertake installation, enhancement and renewal of overhead line equipment earthing and bonding under direction RN5260/K/615/6093 |
Level 2 | 40 | |
Undertake overhead line equipment main steelwork installation under direction RN5260/H/615/6089 |
Level 2 | 40 | |
Undertake overhead line equipment small part steelwork installation under direction RN5260/Y/615/6090 |
Level 2 | 40 | |
Undertake overhead line equipment wiring installation under direction RN5260/D/615/6091 |
Level 2 | 40 | |
Undertake replacement of permanent way assets and components RN5260/Y/615/6087 |
Level 2 | 40 | |
Using and interpreting engineering data and documentation RN5260/A/615/6082 |
Level 2 | 50 | |
Working efficiently and effectively as a rail engineering operative RN5260/F/615/6083 |
Level 2 | 50 |
