CABWI Level 2 Diploma In Network Construction Operations (Water) – Repair and Maintenance
600/2043/X
- Level: Level 2
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: CABWI Awarding Body (Recognised)
- Total credits: 43
- Guided learning hours: 268
- Total qualification time: 432
- Assessment methods: Portfolio of Evidence
Units (19)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Conduct pressure and soundness testing of water network engineering products or assets RN5223/A/503/1167 |
Level 2 | 4 | 25 |
Create an efficient and effective environment in Utilities Network Construction RN5223/R/503/0316 |
Level 2 | 3 | 10 |
Establish and maintain effective working relationships in Utilities Network Construction RN5223/A/503/0665 |
Level 2 | 2 | 5 |
Excavate and maintain holes and trenches for utilities network construction RN5223/L/503/0685 |
Level 2 | 5 | 35 |
Install equipment for safe working on sites for utilities network construction RN5223/F/503/0683 |
Level 2 | 3 | 20 |
Install equipment for safe working on the highway for utilities network construction RN5223/A/503/0682 |
Level 2 | 4 | 25 |
Install water mains above 300mm nominal bore or 315mm polyethylene RN5223/T/503/1166 |
Level 2 | 5 | 35 |
Install water mains from 150mm-300mm nominal bore or 180mm-315mm polyethylene RN5223/M/503/1165 |
Level 2 | 5 | 35 |
Install water services up to 50mm nominal bore or 63mm polyethylene RN5223/H/503/1163 |
Level 2 | 4 | 30 |
Joint materials by butt fusion processes above 315mm for utilities network construction RN5223/R/503/1160 |
Level 2 | 3 | 24 |
Joint materials by butt fusion processes between 180mm and 315mm for utilities network construction RN5223/Y/503/1161 |
Level 2 | 3 | 24 |
Joint materials by butt fusion processes on Utilities Network Construction, up to 180mm diameter RN5223/J/503/0667 |
Level 2 | 2 | 10 |
Joint materials by electrofusion processes on Utilities Network Construction RN5223/F/503/0666 |
Level 2 | 2 | 10 |
Joint materials by mechanical means on water network construction RN5223/D/503/1162 |
Level 2 | 4 | 25 |
Locate and avoid supply apparatus for utilities network construction RN5223/J/503/0684 |
Level 2 | 4 | 25 |
Maintain a safe and secure working environment in water network construction RN5223/D/503/1159 |
Level 2 | 3 | 23 |
Operate powered tools and equipment for routine and predictable requirements on utilities network construction RN5223/Y/503/0687 |
Level 2 | 4 | 25 |
Reinstate excavation and pavement surfaces after utility network construction operations RN5223/R/503/0686 |
Level 2 | 5 | 35 |
Restore water network components to operational condition by repair RN5223/F/503/1168 |
Level 2 | 5 | 35 |
