NOCN Level 3 NVQ Diploma in Accessing Operations and Rigging (Construction)
600/6844/9
- Level: Level 3
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: NOCN (Recognised)
- Total credits:
- Guided learning hours: 444
- Total qualification time: 840
- Assessment methods: Portfolio of Evidence
Units (37)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Conforming to General Health, Safety and Welfare in the Workplace. RN5194/A/503/1170 |
Level 1 | 2 | 7 |
Commissioning lightning conductor installation systems in the workplace RN5194/R/650/6124 |
Level 2 | 23 | 140 |
Conforming to Productive Working Practices in the Workplace RN5194/J/503/1169 |
Level 2 | 3 | 10 |
Demolishing/Dismantling Brick, Masonry and/or Concrete Structures in the Workplace RN5194/Y/600/7534 |
Level 2 | 19 | 63 |
Erecting and removing specialist access equipment in the workplace RN5194/M/650/5828 |
Level 2 | 22 | 90 |
Erecting metal chimneys in the workplace RN5194/Y/616/3783 |
Level 2 | 19 | 63 |
Identifying and marking the location of utilities apparatus and sub-structures in the workplace RN5194/D/617/1416 |
Level 2 | 12 | 65 |
Installing and removing temporary lifting and suspension apparatus in the workplace RN5194/L/650/6122 |
Level 2 | 25 | 100 |
Installing and setting up fall protection systems in the workplace RN5194/M/650/6132 |
Level 2 | 19 | 120 |
Installing lightning conductor systems in the workplace RN5194/M/650/6123 |
Level 2 | 20 | 100 |
Moving, Handling and Storing Resources in the Workplace RN5194/F/503/1171 |
Level 2 | 5 | 17 |
Preparing and operating boom-type mobile elevating work platforms – MEWP – in the workplace RN5194/M/506/4649 |
Level 2 | 14 | 47 |
Preparing and operating scissor-type mobile elevating work platforms – MEWP – in the workplace RN5194/K/506/4648 |
Level 2 | 12 | 40 |
Producing One-off Components to Restore or Maintain the Operational Functions of Plant or Machinery in the Workplace RN5194/R/505/0162 |
Level 2 | 19 | 63 |
Use access equipment up to six metres in the workplace RN5194/T/650/6143 |
Level 2 | 8 | 37 |
Utilising the provision of fall protection systems in the workplace RN5194/F/650/5823 |
Level 2 | 17 | 90 |
Carrying Out Site Measurements and Evaluations in the Workplace RN5194/L/503/9919 |
Level 3 | 19 | 63 |
Confirming the Occupational Method of Work in the Workplace RN5194/R/503/2924 |
Level 3 | 11 | 37 |
Confirming Work Activities and Resources for an Occupational Work Area in the Workplace RN5194/A/503/2772 |
Level 3 | 10 | 33 |
Determining and Advising on the Viability of Repair or Replacement for Returning Plant or Machinery to Service in the Workplace RN5194/A/505/0172 |
Level 3 | 28 | 93 |
Developing and maintaining good occupational working relationships in the workplace RN5194/Y/617/9062 |
Level 3 | 8 | 27 |
Erecting and dismantling falsework scaffolds in the workplace RN5194/Y/650/6135 |
Level 3 | 23 | 110 |
Erecting and dismantling overhead scaffolds in the workplace RN5194/T/650/6134 |
Level 3 | 25 | 120 |
Erecting and dismantling shoring scaffolds in the workplace RN5194/D/650/6137 |
Level 3 | 26 | 120 |
Erecting and dismantling steeplejack scaffolds for multi-faceted surfaces in the workplace RN5194/H/650/6139 |
Level 3 | 26 | 120 |
Erecting and dismantling temporary roof scaffolds in the workplace RN5194/F/650/6138 |
Level 3 | 21 | 100 |
Erecting specialised, designed scaffolds and rigging in the workplace RN5194/R/650/6133 |
Level 3 | 25 | 120 |
Handing Over Plant or Machinery to the Control of Others in the Workplace RN5194/F/505/0268 |
Level 3 | 19 | 63 |
Inspecting and testing lightning protection systems in the workplace RN5194/Y/650/6144 |
Level 3 | 21 | 150 |
Inspecting scaffolding and rigging systems in the workplace RN5194/J/650/5825 |
Level 3 | 21 | 150 |
Installing construction anchors in the workplace RN5194/M/617/3042 |
Level 3 | 17 | 90 |
Installing ducting and flue systems in the workplace RN5194/M/650/6141 |
Level 3 | 25 | 120 |
Installing electrical earthing systems in the workplace RN5194/R/650/6142 |
Level 3 | 30 | 215 |
Installing sheet metal cladding to chimneys or ducting in the workplace RN5194/L/650/6140 |
Level 3 | 25 | 120 |
Monitoring progress of work against schedules in the workplace RN5194/Y/617/2581 |
Level 3 | 10 | 30 |
Providing Technical Information, Advice and Guidance to Users of Plant or Machinery in the Workplace RN5194/J/505/0174 |
Level 3 | 19 | 63 |
Site testing of construction fixings in the workplace RN5194/T/617/3043 |
Level 3 | 15 | 80 |
