Finder

« Back to finder

ProQual Level 2 NVQ Diploma in Sub-structure Work Occupations (Construction)

603/1144/7

  • Level: Level 2
  • Type: Occupational Qualification
  • Status: Available to learners
  • Offered in England: Yes
  • Awarding body: ProQual Awarding Body (Recognised)
  • Total credits:
  • Guided learning hours: 141
  • Total qualification time: 1470
  • Assessment methods: Portfolio of Evidence

Open official specification

Units (35)

Unit Level Credits GLH
Conforming to General Health, Safety and Welfare in the Workplace
RN5334/M/508/6537
Level 1 7
Inspecting and completing user maintenance on plant or machinery in the workplace
RN5334/Y/615/2363
Level 1 55
Carrying out chemical and resin grouting and soil injection in the workplace
RN5334/M/615/4992
Level 2 60
Conforming to Productive Working Practices in the Workplace
RN5334/T/508/6538
Level 2 2 17
Erecting and striking underpinning formwork in the workplace
RN5334/A/615/4980
Level 2 30
Excavating and providing temporary support to pits and trenches in the workplace
RN5334/J/615/4979
Level 2 57
Excavating for underpinning in the workplace
RN5334/A/615/4977
Level 2 47
Installing deep well dewatering systems in the workplace
RN5334/R/615/5018
Level 2 60
Installing dry packing in the workplace
RN5334/L/615/4983
Level 2 30
Installing ejector dewatering systems in the workplace
RN5334/Y/615/5019
Level 2 60
Installing mass gravity retaining structures in the workplace
RN5334/M/615/5012
Level 2 100
Installing mechanical ground anchors in the workplace
RN5334/R/615/5021
Level 2 57
Installing open hole ground anchors in the workplace
RN5334/Y/615/5022
Level 2 67
Installing piles in areas of restricted access (mini or micro piling) in the workplace
RN5334/M/615/4989
Level 2 103
Installing post tensioning system as sub-structural repair in the workplace
RN5334/K/615/5025
Level 2 57
Installing precast concrete retaining structures in the workplace
RN5334/T/615/5013
Level 2 100
Installing reinforcement for the formation of soil structures and slopes in the workplace
RN5334/A/615/5014
Level 2 100
Installing reinforcement steel for underpinning in the workplace
RN5334/J/615/4982
Level 2 57
Installing self-drilling ground anchors in the workplace
RN5334/D/615/5023
Level 2 70
Installing wellpoint dewatering systems in the workplace
RN5334/L/615/5017
Level 2 60
Installing, constructing, maintaining, dismantling and removing temporary works in the workplace
RN5334/H/615/4987
Level 2 73
Installing, maintaining and removing work area protection and safety equipment in the workplace
RN5334/J/617/1197
Level 2 55
Moving, handling and storing resources in the workplace
RN5334/Y/508/6533
Level 2 5 17
Placing and Compacting Concrete in the Workplace
RN5334/D/615/4986
Level 2 37
Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace
RN5334/A/508/6587
Level 2 23
Preparing the site for chemical and resin grouting and soil injection in the workplace
RN5334/H/615/4990
Level 2 60
Preparing the site for the installation of dewatering systems in the workplace
RN5334/J/615/5016
Level 2 43
Preparing the site for the installation of post tensioning systems as sub-structural repair in the workplace
RN5334/H/615/5024
Level 2 47
Preparing the site to install ground anchors in the workplace
RN5334/L/615/5020
Level 2 50
Preparing to install gas membranes in the workplace
RN5334/M/615/5026
Level 2 50
Repairing sub-structure after underpinning in the workplace
RN5334/Y/615/4985
Level 2 50
Setting Out Secondary Dimensional Work Control in the Workplace
RN5334/K/508/6536
Level 2 33
Slinging and hand signalling the movement of suspended loads in the workplace
RN5334/A/508/6525
Level 2 33
Stabilising steep slopes in the workplace
RN5334/F/615/5015
Level 2 83
Setting out and marking positions for underpinning sequence in the workplace
RN5334/K/615/4862
Level 3 43