ProQual Level 2 NVQ Diploma in Construction using Off-site Manufactured Assemblies (Construction)
603/3410/1
- Level: Level 2
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: ProQual Awarding Body (Recognised)
- Total credits:
- Guided learning hours: 217
- Total qualification time: 370
- Assessment methods: Portfolio of Evidence
Units (23)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Conforming to General Health, Safety and Welfare in the Workplace RN5334/M/508/6537 |
Level 1 | 7 | |
Applying Surface Coatings by Brush and Roller in the Workplace RN5334/T/615/2211 |
Level 2 | 80 | |
Conforming to Productive Working Practices in the Workplace RN5334/T/508/6538 |
Level 2 | 2 | 17 |
Erecting precast concrete structural units in the workplace RN5334/M/615/1736 |
Level 2 | 130 | |
Erecting steel frame walls, floors and roofs in the workplace RN5334/M/617/1436 |
Level 2 | 80 | |
Finishing dry lining walls and ceilings in the workplace RN5334/A/615/1240 |
Level 2 | 120 | |
Installing basic plumbing in the workplace RN5334/L/615/1842 |
Level 2 | 90 | |
Installing first fixing components in the workplace RN5334/A/617/1441 |
Level 2 | 60 | |
Installing plasterboard linings in the workplace RN5334/F/615/1241 |
Level 2 | 120 | |
Installing sheeting and cladding systems on roofs and walls in the workplace RN5334/F/616/1705 |
Level 2 | 67 | |
Installing supplementary steel frame finishings in the workplace RN5334/T/617/1437 |
Level 2 | 110 | |
Installing, dismantling and maintaining modular buildings in the workplace RN5334/F/617/1439 |
Level 2 | 100 | |
Installing, maintaining and decommissioning portable cabins, units and temporary buildings in the workplace RN5334/T/617/1440 |
Level 2 | 110 | |
Maintaining non-structural carpentry work in the workplace RN5334/A/617/1200 |
Level 2 | 47 | |
Moving, handling and storing resources in the workplace RN5334/Y/508/6533 |
Level 2 | 5 | 17 |
Preparing and assembling cold formed steel frames in the workplace RN5334/A/617/1438 |
Level 2 | 90 | |
Preparing and operating boom-type mobile elevating work platforms – MEWP – in the workplace RN5334/M/506/4649 |
Level 2 | 14 | 47 |
Preparing and operating mast climber-type mobile elevating work platforms, MEWP, in the workplace RN5334/T/508/6510 |
Level 2 | 40 | |
Preparing and operating scissor-type mobile elevating work platforms – MEWP – in the workplace RN5334/K/506/4648 |
Level 2 | 12 | 40 |
Slinging and hand signalling the movement of suspended loads in the workplace RN5334/A/508/6525 |
Level 2 | 33 | |
Applying coatings by the air spray method in the workplace RN5334/H/615/2219 |
Level 3 | 100 | |
Preparing backing walls to receive rainscreen wall cladding systems in the workplace RN5334/L/616/1707 |
Level 3 | 67 | |
Preparing surfaces by abrasive blast cleaning in the workplace RN5334/R/615/2216 |
Level 3 | 53 |
