NOCN Level 2 NVQ Diploma in Sub-structure Work Occupations (Construction)
603/1279/8
- Level: Level 2
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: NOCN (Recognised)
- Total credits:
- Guided learning hours: 147
- Total qualification time: 440
- Assessment methods: Portfolio of Evidence
Units (32)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Conforming to General Health, Safety and Welfare in the Workplace. RN5194/A/503/1170 |
Level 1 | 2 | 7 |
Inspecting and completing user maintenance on plant or machinery in the workplace RN5194/M/615/0165 |
Level 1 | 8 | 45 |
Carrying out chemical and resin grouting and soil injection in the workplace RN5194/T/617/4936 |
Level 2 | 18 | 60 |
Carrying out structural waterproofing in the workplace RN5194/D/615/4390 |
Level 2 | 18 | 60 |
Conforming to Productive Working Practices in the Workplace RN5194/J/503/1169 |
Level 2 | 3 | 10 |
Erecting and striking underpinning formwork in the workplace RN5194/F/615/6049 |
Level 2 | 9 | 30 |
Excavating and providing temporary support to pits and trenches in the workplace RN5194/K/615/6028 |
Level 2 | 17 | 57 |
Excavating for underpinning in the workplace RN5194/H/615/6027 |
Level 2 | 14 | 47 |
Installing deep well dewatering systems in the workplace RN5194/D/615/6043 |
Level 2 | 18 | 60 |
Installing dry packing in the workplace RN5194/H/615/6030 |
Level 2 | 9 | 30 |
Installing ejector dewatering systems in the workplace RN5194/H/615/6044 |
Level 2 | 18 | 60 |
Installing gas membranes in the workplace RN5194/M/615/6046 |
Level 2 | 19 | 63 |
Installing mass gravity retaining structures in the workplace RN5194/F/615/6035 |
Level 2 | 30 | 100 |
Installing piles in areas of restricted access (mini or micro piling) in the workplace RN5194/T/615/6033 |
Level 2 | 31 | 103 |
Installing precast concrete retaining structures in the workplace RN5194/R/615/6038 |
Level 2 | 30 | 100 |
Installing reinforcement for the formation of soil structures and slopes in the workplace RN5194/Y/615/6039 |
Level 2 | 30 | 100 |
Installing reinforcement steel for underpinning in the workplace RN5194/M/615/6029 |
Level 2 | 17 | 57 |
Installing wellpoint dewatering systems in the workplace RN5194/Y/615/6042 |
Level 2 | 18 | 60 |
Installing, constructing, maintaining, dismantling and removing temporary works in the workplace RN5194/L/615/6037 |
Level 2 | 22 | 73 |
Installing, maintaining and removing work area protection and safety equipment in the workplace RN5194/K/617/1418 |
Level 2 | 10 | 55 |
Moving, Handling and Storing Resources in the Workplace RN5194/F/503/1171 |
Level 2 | 5 | 17 |
Placing and compacting concrete in the workplace RN5194/M/615/6032 |
Level 2 | 11 | 37 |
Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace RN5194/F/506/4672 |
Level 2 | 7 | 23 |
Preparing surfaces for structural waterproofing in the workplace RN5194/T/615/6047 |
Level 2 | 11 | 37 |
Preparing the site for chemical and resin grouting and soil injection in the workplace RN5194/M/617/4935 |
Level 2 | 18 | 60 |
Preparing the site for the installation of dewatering systems in the workplace RN5194/R/615/6041 |
Level 2 | 13 | 43 |
Preparing to install gas membranes in the workplace RN5194/K/615/6045 |
Level 2 | 15 | 50 |
Repairing sub-structure after underpinning in the workplace RN5194/K/615/6031 |
Level 2 | 15 | 50 |
Setting out secondary dimensional work control in the workplace RN5194/J/506/4673 |
Level 2 | 7 | 23 |
Slinging and hand signalling the movement of suspended loads in the workplace RN5194/R/506/3929 |
Level 2 | 10 | 33 |
Stabilising steep slopes in the workplace RN5194/L/615/6040 |
Level 2 | 25 | 83 |
Setting out and marking positions for underpinning sequence in the workplace RN5194/J/615/6036 |
Level 3 | 13 | 43 |
