City & Guilds Level 2 Diploma in Network Construction Operations (Gas) – Main layer
600/1534/2
- Level: Level 2
- Type: Occupational Qualification
- Status: Available to learners
- Offered in England: Yes
- Awarding body: City & Guilds Limited (Recognised)
- Total credits: 44
- Guided learning hours: 210
- Total qualification time: 440
- Assessment methods: Portfolio of Evidence
Units (25)
| Unit | Level | Credits | GLH |
|---|---|---|---|
Conduct specified connections to gas network mains and commissioning RN6142/L/503/0699 |
Level 2 | 3 | 18 |
Conduct specified testing of Gas network engineering products or assets – mains RN6142/F/503/0697 |
Level 2 | 3 | 10 |
Conduct specified testing of Gas networks associated with leakage location RN6142/Y/503/0673 |
Level 2 | 3 | 20 |
Create an efficient and effective environment in Utilities Network Construction RN6142/R/503/0316 |
Level 2 | 3 | 10 |
Establish and maintain effective working relationships in Utilities Network Construction RN6142/A/503/0665 |
Level 2 | 2 | 5 |
Excavate and maintain holes and trenches for utilities network construction RN6142/L/503/0685 |
Level 2 | 5 | 35 |
Install equipment for safe working on sites for utilities network construction RN6142/F/503/0683 |
Level 2 | 3 | 20 |
Install equipment for safe working on the highway for utilities network construction RN6142/A/503/0682 |
Level 2 | 4 | 25 |
Joint materials by butt fusion processes on Utilities Network Construction, above 180mm diameter RN6142/L/503/0668 |
Level 2 | 2 | 10 |
Joint materials by butt fusion processes on Utilities Network Construction, up to 180mm diameter RN6142/J/503/0667 |
Level 2 | 2 | 10 |
Joint materials by electrofusion processes on Utilities Network Construction RN6142/F/503/0666 |
Level 2 | 2 | 10 |
Locate and avoid supply apparatus for utilities network construction RN6142/J/503/0684 |
Level 2 | 4 | 25 |
Maintain a safe and secure working environment in Utilities Network Construction RN6142/R/503/0669 |
Level 2 | 3 | 10 |
Operate powered tools and equipment for routine and predictable requirements on utilities network construction RN6142/Y/503/0687 |
Level 2 | 4 | 25 |
Reinstate excavation and pavement surfaces after utility network construction operations RN6142/R/503/0686 |
Level 2 | 5 | 35 |
Restore Gas network components to operational condition by repair RN6142/L/503/0671 |
Level 2 | 2 | 10 |
Analyse and interpret the results of Gas Leakage Surveys to determine the location of Gas Escapes RN6142/D/503/0674 |
Level 3 | 3 | 20 |
Decommissioning and abandonment of mains and services 63mm and above RN6142/H/506/0789 |
Level 3 | 7 | 60 |
Install gas engineering products or assets above 180mm up to and including 355mm RN6142/R/506/4756 |
Level 3 | 7 | 63 |
Install gas engineering products or assets above 355mm RN6142/L/506/4755 |
Level 3 | 9 | 86 |
Install gas engineering products or assets up to 180mm RN6142/M/503/0694 |
Level 3 | 13 | 50 |
Joint materials by fusion processes on utilities network construction, above 180mm diameter RN6142/J/506/4754 |
Level 3 | 9 | 83 |
Minimise risks to life, property and the environment during Gas escapes RN6142/R/503/0672 |
Level 3 | 3 | 20 |
Operate safely in emergency situations within the gas intermediate pressure range RN6142/D/506/4758 |
Level 3 | 2 | 16 |
Operate within the gas intermediate pressure range RN6142/Y/506/4757 |
Level 3 | 3 | 23 |
